Find the most up-to-date version of CEN – EN at Engineering Testing fresh concrete – Part 1: Sampling – SS-EN This European Standard specifies two procedures for sampling fresh concrete, by composite. 1 Apr This British Standard specifies two procedures for sampling fresh concrete which are implemented by composite sampling and by spot.

Author: Kigashicage Ararr
Country: Rwanda
Language: English (Spanish)
Genre: Health and Food
Published (Last): 14 September 2004
Pages: 215
PDF File Size: 4.37 Mb
ePub File Size: 13.93 Mb
ISBN: 867-4-66089-361-8
Downloads: 25829
Price: Free* [*Free Regsitration Required]
Uploader: Kigalar

En 12350-1 the temperature measurement within 5 min except for concrete containing the coarse aggregate of a nominal maximum size greater than 75 mm which may require up to 20 min for the transfer of heat en 12350-1 the aggregate to the mortar.

Message to your colleague. You may experience issues viewing this site en 12350-1 Internet Explorer 9, 10 or Apparatus Mold Mold use for slump test of fresh concrete Dimension in mm Metallic, Frustum of a cone Alternative materials are allowed if requirements are met comparability tests Tamping Rod Round, straight steel rod, length mm and diameter 16mm Tamping end rounded to a hemispherical tip Measuring Device Ruler Marked in increments of 5 mm or smaller En 12350-1 of at least mm In en 12350-1, a scoop is needed.

You are commenting using your Facebook account.

Click to learn more. Disregard the first part and the last part of the load and take at least 4 increments. Sampling Concrete It is acceptable to en 12350-1 the temperature in: The place else en 12350-1 anybody get that type en 12350-1 info in such a perfect means of writing?

Difference of the two samplings — Composite sampling is more diverse as it is the representative of the whole truck load. We use cookies to make our website easier to use and to better understand your needs. Both parties will agree to the specific time limit as substantiated from the concrete design mix. Compacting by hand with compacting rod or bar Distribute the strokes in a uniform manner over the cross-section of the mould. In some big projects, imagine the time consumed to perform the composite sampling when there is en 12350-1 lot of concrete truck mixers en 12350-1 queue at the checkpoint area.

Record the date and time of sampling. Materials en 12350-1, Test specimens, Sampling methods, Concretes, Samples, Cement and concrete technology.

There is often debate about the en 12350-1 limit between placing fresh concrete against fresh concrete already placed and compacted i. It depends upon the project specifications on particular project area of jurisdiction. As the load is discharged, sampling should be taken from the whole width and depth not just the top part. Leave the TMD in the concrete a minimum of 2 min. Find Similar En 12350-1 This product falls into the following categories.

CEN – EN – Testing fresh concrete – Part 1: Sampling | Engineering

Please note that the selected standard is invalid. It may be used to en 12350-1 conformance to a specified requirement for the temperature of concrete. I have a presentation subsequent week, and I am on the look for such info.

Half of the strokes near perimeter, and then progressing with vertical strokes spirally toward the center. The first school of thought is rather straightforward: Extended delays in placing can lead to a 1235-1 loss of consistency with en 12350-1 making it impossible en 12350-1 place with satisfactory compaction.

Standard: CEN – EN 12350-1

What is the frequency of Sampling of Concrete? Apparatus Container, large enough to provide at least 75 mm of concrete in all directions around the sensor en 12350-1 the temperature measuring device, or at least three times the NMAS Nominal Maximum Aggregate Sizewhichever is greater.

Learn more about the en 12350-1 we use and how to change your settings.

Your shopping cart is empty. A sample of concrete is placed in en 12350-1 mold, shaped as the frustum of en 12350-1 cone, and compacted. Avoid over-vibration, which may cause loss of entrained air. Ensure that the compacting rod, or bar, does not forcibly strike the bottom of the mould when compacting the first layer, nor penetrate significantly any previous layer.

Leave a Reply Cancel reply Enter your comment here The elapsed time shall en 12350-1 exceed 15 min.